Teak & Holly Flooring

Replacing an old floor with new teak & holly veneered plywood was a project with huge impact on the interior of the boat.

Details

Painting the topsides in Alexseal

Updating the topsides of a Nor'West 33 with Alexseal in Aristo Blue -- including 4 coats of primer, revitalizing the look of the boat.

Details

Repowering to a new Beta 25

Repowering the original 1981 Westerbeke 21 during the worst of a Maine winter.

Details

Integral Watertanks

Replacing old corroded stainless tanks and increasing the overall tankage with new fibreglass integral water tanks.

Details

Adding Storage Behind the Settees

Adapting the open space behind the boat's settees to create additional storage.

Details