Teak & Holly Flooring
Replacing an old floor with new teak & holly veneered plywood was a project with huge impact on the interior of the boat.
Painting the topsides in Alexseal
Updating the topsides of a Nor'West 33 with Alexseal in Aristo Blue -- including 4 coats of primer, revitalizing the look of the boat.
Repowering to a new Beta 25
Repowering the original 1981 Westerbeke 21 during the worst of a Maine winter.
Integral Watertanks
Replacing old corroded stainless tanks and increasing the overall tankage with new fibreglass integral water tanks.
Adding Storage Behind the Settees
Adapting the open space behind the boat's settees to create additional storage.