Skip to content
Jonathan Tetro
Marine Services & Deliveries on the USA East Coast
  • Recent Projects
    • Projects
  • About
  • Contact

Month: October 2018

Adding storage behind the settees

October 28, 2018 Jonathan Leave a comment

The original open empty space Tabbing in the bulkheads The divided cupboard The divided cupboard Cupboard with cushions Veneered cupboards…

Continue Reading →

Building integral fibreglass water tanks

Jonathan Leave a comment

Original stainless tank – corroded Water pickup and thruhull First coat of West Systems epoxy End wall of the tank…

Continue Reading →

Painting the topsides in Alexseal – Aristo Blue

October 25, 2018 Jonathan Leave a comment

Failing paint on the topsides Failing paint Fully sanded topsides Filling holes in the topsides Fairing the topsides First coat…

Continue Reading →

Repowering to a Beta 25 from a Westerbeke 21

October 24, 2018 Jonathan 3 Comments

The old Westerbeke W21 Removing the old engine Sold the Westerbeke Jig for the new Beta 25 Empty engine bed…

Continue Reading →

Recent Posts

  • Rebuilding a rotten mast-step and stringer in a Sabre 42 CB Sailboat
  • Adding storage behind the settees
  • Building integral fibreglass water tanks

Recent Comments

  • Richard Oulton on Repowering to a Beta 25 from a Westerbeke 21
  • Jonathan on Repowering to a Beta 25 from a Westerbeke 21
  • Richard Oulton on Repowering to a Beta 25 from a Westerbeke 21

Archives

  • March 2021
  • October 2018
  • October 2016

Jonathan Tetro | Marine Services & Deliveries

  • jonathan@jonathantetro.com
  • Bailey Island, Maine
Copyright © 2023 Jonathan Tetro — Primer WordPress theme by GoDaddy