New core in place Fairing and sanding Softsand application for non-skid texture Alexseal topcoat Baffle layup LiquaTile 1172 Potable Water coating Finished integral tanks jig locating mast base plate on existing step compromised mast step compromised mast step removed fiberglass half round for mast step limber hole limber hole half round bonded down 1st layer of fiberglass over mast step core all layers complete over mast step core bulkhead repair and tabbing faired new teak veneer The original open empty space Tabbing in the bulkheads The divided cupboard Veneered cupboards in use